Tuesday, 8 May 2012
4.05.12. Kitchen is now in. A sure sign that the end is near. Kitchen joinery is in and benchtop has been measured up. Painting, although well under way, colour is only now appearing. Externally only for the moment. By next post there should be more colour internally as well.
Saturday, 28 April 2012
27.04.12. Very quiet on site today. After weeks of tradesmen running around all over the site, with deliveries and installations, today was quite peaceful. Great for going around taking photos of everything without getting in the way.
| Kitchen installation has commenced |
| Lower cupboards are in |
| Shower screen to ensuite |
| Mirror to WC |
| Hall cupboard |
| View to kids playroom |
| Water tanks now in place |
| Laying of decking has commenced |
| Hey Look- Solar Panels are in |
Sunday, 22 April 2012
22.04.12. Had a site meeting today with Lynette and Dave. Lynette made a fleeting two day visit, with her wide angle camera, so have some great shots of the interiors.
![]() |
| Looking toward kitchen |
![]() |
| Looking out kitchen door toward the street |
![]() |
| Looking out to back yard from kitchen area |
![]() |
| Looking towards lounge and deck |
![]() |
| Looking toward TV area in lounge room |
![]() |
| Installation of kitchen has begun |
![]() |
| Looking into laundry- cavity slider with concealed track and no jamb |
![]() |
| Cabanna is to get a face lift as well- a fresh coat of paint inside and out |
![]() |
| The guys, looking just a bit too comfortable, in their new mess room in the cabanna |
![]() |
| That great view looking toward the rear of the house. |
![]() |
| Doors to study |
![]() |
| Fireplace with mantle and hearth removed. Now gyprock lined, timber floor patched and skirting fitted |
| Ensuite window has a new awning over |
| Kitchen arrives to site- in many pieces |
| Exterior colour- Dulux Ticking Took a while to select but looks perfect |
| Water tanks arrive on site- this is what 10 000L of water tanks look like |
| Bathroom joinery- being installed |
| All windows have now been replaced and frames have been cut into the weatherboards |
| Detail shot of ceiling roses on wall in bedroom |
Friday, 13 April 2012
13.04.12 Friday the 13th yet again. Uploading photos taken today. Looking at key issues only. Comments appear under the photos.
| Recessed TV area with Bulkhead over |
| Another shot of recessed area showing depth |
| Looking across recessed TV area |
| Guild Grey, Leadman, and Ito (turned too much toaward sun) |
| Ito, Leadman and Guild Grey (in the shade) on the south side |
| As above with Dieskau |
| Leadman - on the north side of house |
Monday, 9 April 2012
9.04.12. Went out to site on tuesday and did some colour samples, thought it might make final colour selections a bit easier.
The two blues selected, are the mid tone blues, Guild Grey and Ito.
The light grey exterior colour is the Dieskau, and the Orangade Door. Interior colours we have the Grey Pail for the Art Wall and Jarrah for the boys room.
Remember all colours have only one coat. If you are unsure of any let me know and I will do a second coat when on site.
| Ito and Dieskau |
| Guild Grey and Dieskau |
| Changing the colour at the corner |
| Continuing the colour to all new cladding |
| Guild Grey into the corner |
Ito and Guild Grey side by side |
| Art Wall in Grey Pail |
| Grey Pail and Orangeade Door |
| Jarrah |
Subscribe to:
Posts (Atom)













