30.03.12. Another beautiful day on site. Lots of action with gyprocking and roof sheeting being carried out. You will notice from photos that there has been a huge amount of work done since last post. Flooring has been laid, tiles have been laid and gyprocking is being carried out. It looks amazing on site, not sure if pictures capture it quite as well as being here.


Front elevation- New roof being installed
Renovation as viewed from street

Ensuite Tiled
Main Bathroom Tiled

Fireplace getting a facelift. Hearth is in.
Gyprock to kids room


Great view of living area/ deck relationship
View of main bedroom
 
Full View of Exterior


Friday, 16 March 2012

16.03.12.Another perfect day on site today. All work progressing well. Back entry into the kitchen looks like it needs a bit of a lift, I have included some photos below so we may all be able to have a bit of a brain storm, see if there is something we can do to stop it looking flat. Any ideas welcome, we can probably talk about exterior colours. I think that may help as well.

Kitchen entry viewed from front deck

Kitchen entry viewed from carport



View of balustrading to kitchen door





Friday, 9 March 2012

9.03.12. Finally a sunny day. Maybe Dave should come to site more often if he is going to bring the sunshine with him. Heaps has happened in this last fortnight as you can see from the photos. Glass is now in all windows and we also have doors.

We have now reached lock up stage!!!

When I say we it almost sounds like I have actually had a part in making this happen. Of course the progress has had nothing to do with me. Steve and Wes have done an amazing job. We have had so much rain in this last fortnight and still they carry on regardless. I don't think they notice it any more. This next week will see exterior linings and drainage being worked on prior to interior linings starting in about a fortnight.

Highlight windows and doors


Close up of windows
Back elevation
Glimpse of hightlight windows


Entry door now also in















Monday, 5 March 2012



24.02.12. A rare sunny day on site. A lot of the cladding is now on. Window frames are on, ready for glass due to be installed next week. Guttering is in, as is most of the roofing.

Roof over kitchen entry


Carport to handrail connection
The back entry with stair and handrail framed up
This photo does not reflect the pace of things on site


Back facade west side
Back facade east side










Monday, 20 February 2012

19.02.12. Photos taken friday 17 Feb. Things finally starting to look different out here cladding is going on very quickly. Plumbing rough in complete. Electrical well under way. If you look closely you can see the electrical cabling hanging down from the ceiling.

View along back deck
 
Plumbing roughed in to ensuite
Electical cabliing to kids play room

Cladding going in to the west facade
Cladding on east side, on watertanks wall

Cladding to the kitchen entry


Sunday, 19 February 2012


19.02.12.These photos were taken on the 14 Feb. Still raining. There is a lot more people on site these days. Plumber was roughing in the day these photos were taken.


This shot captures how much has changed in the last few weeks

Looking toward kitchen


New deck takes shape


Strip windows



Kids play room













19.02.12 The thing you notice most when you arrive on site these days is all the timber that has been erected since the last visit. These photos were taken on the 24 Jan and 3 Feb. Just two weeks after my last post. Timber goes up and so do the tarps. 



Looking at kids room from garden
Looking at roof above kitchen entry


Tarps are now on
No problem working in the rain now.
Even with power tools


Close up of kitchen entry roof framing