19.02.12. Photos taken friday 17 Feb. Things finally starting to look different out here cladding is going on very quickly. Plumbing rough in complete. Electrical well under way. If you look closely you can see the electrical cabling hanging down from the ceiling.

View along back deck
 
Plumbing roughed in to ensuite
Electical cabliing to kids play room

Cladding going in to the west facade
Cladding on east side, on watertanks wall

Cladding to the kitchen entry


Sunday 19 February 2012


19.02.12.These photos were taken on the 14 Feb. Still raining. There is a lot more people on site these days. Plumber was roughing in the day these photos were taken.


This shot captures how much has changed in the last few weeks

Looking toward kitchen


New deck takes shape


Strip windows



Kids play room













19.02.12 The thing you notice most when you arrive on site these days is all the timber that has been erected since the last visit. These photos were taken on the 24 Jan and 3 Feb. Just two weeks after my last post. Timber goes up and so do the tarps. 



Looking at kids room from garden
Looking at roof above kitchen entry


Tarps are now on
No problem working in the rain now.
Even with power tools


Close up of kitchen entry roof framing