Sunday 27 May 2012

25.05.12. Lots of colour is now starting to appear. The 'kitchen door' has a couple of coats of 'Orangade'. Apart from the door most of the other 'colour' is monochrome. Wall paper to master bedroom and living room is finished. Interior mostly finished apart from lighting, carpet and a bit of painting. Floor sanding is booked for monday.








Friday 11 May 2012

11.05.12. Most of the painting internally has now been completed. Joinery is being installed. Interior generally is mostly finished. Painting externally will begin in ernest next week.

Kitchen entrance- the timber stairs now built
View of island bench and kitchen cupboards from garden

Boy's Room

Boy's Room connection between brown walls and robe

Nell's Room
Entrance to Walk in Robe

Lynette's Side

Dave's Side

Laundry Joinery - mostly installed

Grab rail in bathroom has been added
 
Detail of timber inserts in track of sliding doors


Existing screen planting beside water tanks

Tuesday 8 May 2012

4.05.12. Kitchen is now in. A sure sign that the end is near. Kitchen joinery is in and benchtop has been measured up. Painting, although well under way, colour is only now appearing. Externally only for the moment. By next post there should be more colour internally as well.