Saturday 28 April 2012

27.04.12. Very quiet on site today. After weeks of tradesmen running around all over the site, with deliveries and installations, today was quite peaceful. Great for going around taking photos of everything without getting in the way.

Kitchen installation has commenced

Lower cupboards are in

Shower screen to ensuite
Mirror to WC


Hall cupboard
View to kids playroom

Water tanks now in place

Laying of decking has commenced
Hey Look- Solar Panels are in

Sunday 22 April 2012

22.04.12. Had a site meeting today with Lynette and Dave. Lynette made a fleeting two day visit, with her wide angle camera, so have some great shots of the interiors.

Looking toward kitchen

Looking out kitchen door toward the street


Looking out to back yard from kitchen area

Looking towards lounge and deck

Looking toward TV area in lounge room

Installation of kitchen has begun
Looking into laundry- cavity slider with
concealed track and no jamb

Cabanna is to get a face lift as well- a fresh coat of paint inside and out
The guys, looking just a bit too comfortable,
 in their new mess room in the cabanna

That great view looking toward the rear of the house.




Doors to study

Fireplace with mantle and hearth removed. Now gyprock lined,
timber floor patched and skirting fitted
 
Ensuite window has a new awning over
 
Kitchen arrives to site- in many pieces

 
Exterior colour- Dulux Ticking
Took a while to select but looks perfect

Water tanks arrive on site- this is what 10 000L
of water tanks look like


Bathroom joinery- being installed
All windows have now been replaced and frames
have been cut into the weatherboards

Detail shot of ceiling roses on wall in bedroom


Friday 13 April 2012



13.04.12 Friday the 13th yet again. Uploading photos taken today. Looking at key issues only. Comments appear under the photos.
Recessed TV area with Bulkhead over
Another shot of recessed area showing depth
Looking across recessed TV area

Guild Grey, Leadman, and Ito (turned too much toaward sun)

Ito, Leadman and Guild Grey (in the shade) on the south side

As above with Dieskau

Leadman - on the north side of house

Monday 9 April 2012


9.04.12. Went out to site on tuesday and did some colour samples, thought it might make final colour selections a bit easier.

The two blues selected, are the mid tone blues, Guild Grey and Ito.

The light grey exterior colour is the Dieskau, and the Orangade Door. Interior colours we have the Grey Pail for the Art Wall and Jarrah for the boys room.
Remember all colours have only one coat.  If you are unsure of any let me know and I will do a second coat when on site.



Ito and Dieskau




Guild Grey and Dieskau




Changing the colour at the corner
 
Continuing the colour to all new cladding


Guild Grey into the corner

Ito and Guild Grey side by side



Art Wall in Grey Pail
Grey Pail and Orangeade Door
 


Jarrah