24.02.12. A rare sunny day on site. A lot of the cladding is now on. Window frames are on, ready for glass due to be installed next week. Guttering is in, as is most of the roofing.
| Roof over kitchen entry |
| Carport to handrail connection |
| The back entry with stair and handrail framed up |
| This photo does not reflect the pace of things on site |
| Back facade west side |
| Back facade east side |