24.02.12. A rare sunny day on site. A lot of the cladding is now on. Window frames are on, ready for glass due to be installed next week. Guttering is in, as is most of the roofing.
Roof over kitchen entry |
Carport to handrail connection |
The back entry with stair and handrail framed up |
This photo does not reflect the pace of things on site |
Back facade west side |
Back facade east side |